{"id":1511,"date":"2020-10-18T11:16:00","date_gmt":"2020-10-18T11:16:00","guid":{"rendered":"https:\/\/montra.es\/blog\/news\/siemens-ppal-contrata-a-montra-el-montaje-mecanico-de-la-fase-1b-del-proyecto-de-remodelacion-del-sate-sur-del-aeropuerto-de-palma-de-mallorca\/"},"modified":"2021-05-04T18:06:25","modified_gmt":"2021-05-04T18:06:25","slug":"siemens-ppal-contrata-a-montra-el-montaje-mecanico-de-la-fase-1b-del-proyecto-de-remodelacion-del-sate-sur-del-aeropuerto-de-palma-de-mallorca","status":"publish","type":"post","link":"https:\/\/montra.es\/en\/blog\/noticias-en\/siemens-ppal-contrata-a-montra-el-montaje-mecanico-de-la-fase-1b-del-proyecto-de-remodelacion-del-sate-sur-del-aeropuerto-de-palma-de-mallorca\/","title":{"rendered":"SIEMENS PP&#038;AL contracts MONTRA for the mechanical installation of phase 1B of the remodelling project of SATE SUR at Palma de Mallorca Airport"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;3.22&#8243;][et_pb_row _builder_version=&#8221;3.25&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; hover_enabled=&#8221;0&#8243; sticky_enabled=&#8221;0&#8243;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;3.25&#8243; custom_padding=&#8221;|||&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text _builder_version=&#8221;3.27.4&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221;]<!-- divi:image {\"align\":\"center\",\"id\":1491,\"width\":320,\"height\":215,\"sizeSlug\":\"large\",\"linkDestination\":\"none\"} --><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/montra.es\/wp-content\/uploads\/2021\/05\/PMI.jpg\" alt=\"\" class=\"wp-image-1491\" width=\"320\" height=\"215\" \/><\/figure>\n<\/div>\n<p><!-- \/divi:image --><!-- divi:paragraph {\"align\":\"left\"} --><\/p>\n<p class=\"has-text-align-left\" style=\"text-align: justify;\"><span style=\"color: #ffb400;\" class=\"has-inline-color\"><strong>MONTRA\u00a0<\/strong><\/span>continues the collaboration initiated with SIEMENS PP&amp;AL last year 2018 in the remodelling works at the Palma de Mallorca airport.<\/p>\n<p><!-- \/divi:paragraph --><!-- divi:paragraph {\"align\":\"left\"} --><\/p>\n<p class=\"has-text-align-left\" style=\"text-align: justify;\">The scope of <span style=\"color: #ffb400;\" class=\"has-inline-color\"><strong>MONTRA<\/strong> <\/span>mainly includes the mechanical and electrical unassembly of structures and old conveyors (including collection and separation of waste materials) and the mechanical installation of approximately 4kms of baggaging conveyors and secondary elements (fences, protections&#8230;)<\/p>\n<p class=\"has-text-align-left\" style=\"text-align: justify;\">The works are developed along 7 months and two main levels.<\/p>\n<p class=\"has-text-align-left\" style=\"text-align: justify;\">Additionally, <strong><span class=\"has-inline-color has-luminous-vivid-amber-color\">MONTRA <\/span><\/strong>is awarded with the installation of the baggage TTS sorter.<\/p>\n<p><!-- \/divi:paragraph --><!-- divi:paragraph {\"align\":\"left\",\"className\":\"has-inline-color\"} --><!-- \/divi:paragraph -->[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>MONTRA\u00a0continues the collaboration initiated with SIEMENS PP&amp;AL last year 2018 in the remodelling works at the Palma de Mallorca airport. The scope of MONTRA mainly includes the mechanical and electrical unassembly of structures and old conveyors (including collection and separation of waste materials) and the mechanical installation of approximately 4kms of baggaging conveyors and secondary [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1492,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"<!-- wp:image {\"align\":\"center\",\"id\":1491,\"width\":320,\"height\":215,\"sizeSlug\":\"large\",\"linkDestination\":\"none\"} -->\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img src=\"https:\/\/montra.es\/wp-content\/uploads\/2021\/05\/PMI.jpg\" alt=\"\" class=\"wp-image-1491\" width=\"320\" height=\"215\"\/><\/figure><\/div>\n<!-- \/wp:image -->\n\n<!-- wp:paragraph {\"align\":\"left\"} -->\n<p class=\"has-text-align-left\"><span style=\"color:#ffb400\" class=\"has-inline-color\"><strong>MONTRA <\/strong><\/span>contin\u00faa la l\u00ednea de colaboraci\u00f3n iniciada con SIEMENS PP&amp;AL en 2018 en las obras de remodelaci\u00f3n del Aeropuerto de Palma de Mallorca.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph {\"align\":\"left\"} -->\n<p class=\"has-text-align-left\">El alcance de <span style=\"color:#ffb400\" class=\"has-inline-color\"><strong>MONTRA<\/strong> <\/span>comprende principalmente el desmontaje mec\u00e1nico y el\u00e9ctrico de estructuras y transportadores antiguos (incluyendo segregaci\u00f3n de residuos) y el montaje mec\u00e1nico de 4kms aproximadamente de transportadores de equipajes y elementos colaterales (vallados, protecciones.<br>Los trabajos se desarrollan a lo largo de 7 meses y dos niveles principales.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph {\"align\":\"left\",\"className\":\"has-inline-color\"} -->\n<p class=\"has-text-align-left has-inline-color\">Asimismo se adjudica a <strong><span class=\"has-inline-color has-luminous-vivid-amber-color\">MONTRA <\/span><\/strong>el montaje del clasificador (sorter) TTS de equipajes.<\/p>\n<!-- \/wp:paragraph -->","_et_gb_content_width":"","footnotes":""},"categories":[31],"tags":[],"class_list":["post-1511","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias-en"],"_links":{"self":[{"href":"https:\/\/montra.es\/en\/wp-json\/wp\/v2\/posts\/1511","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/montra.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/montra.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/montra.es\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/montra.es\/en\/wp-json\/wp\/v2\/comments?post=1511"}],"version-history":[{"count":3,"href":"https:\/\/montra.es\/en\/wp-json\/wp\/v2\/posts\/1511\/revisions"}],"predecessor-version":[{"id":1516,"href":"https:\/\/montra.es\/en\/wp-json\/wp\/v2\/posts\/1511\/revisions\/1516"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/montra.es\/en\/wp-json\/wp\/v2\/media\/1492"}],"wp:attachment":[{"href":"https:\/\/montra.es\/en\/wp-json\/wp\/v2\/media?parent=1511"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/montra.es\/en\/wp-json\/wp\/v2\/categories?post=1511"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/montra.es\/en\/wp-json\/wp\/v2\/tags?post=1511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}