As part of the optimization in the supply chain and supply time of material on site, TGW decided to manage all the mechanical brackets/supports needed in all the Projects with MONTRA as global supplier. Standard brackets drawings for several different elements have...
TGW MECHANICS trusts again on MONTRA for mechanical installation of 10 stacker cranes type MUSTANG-R. This crane is a single-mast 25m high machine. MONTRA will be responsible for full installation of machines, aisle equipment and rails. Mustangs will be erected and...
MONTRA got the acceptance for the installation of the customized platform in the inbound area of ZARA ZARAGOZA. MONTRA designed, manufactured and installed this platform as an specific request from the Customer. ZARA needed to walk all along the conveyors which are in...
TGW and INDITEX trust again on MONTRA for the solution of automatic depalletizing system in inbound area installing 4 new OCTOPUS from MONTRA. Two of them will be running in ZARA Meco and two of them in PULL&BEAR Cabanillas Since 2010 MONTRA in direct...
MONTRA renews sponsoring of valencian cycling club DSTREL for the new 2018 season. DSTREL is focused on powering female and paracycling teams and MONTRA sharing these values contributes with this small collaboration....
MONTRA is already developing the new MONTRAveyor for conveying the washing machine frames. BSHE, world leader in home appliances manufacture, has ordered MONTRA the needed changes and extensions for adapting current lines to introduce new F27 model in La Cartuja...